Please Choose Your Language
Black-framed operable sash chu fixed glazed area lian zawk bulah greenery thlir theihna a awm

DERCHI / Window thlan dan tur kaihhruaina

Casement vs Fixed Windows: Eng Type nge I Space-a Inhmeh?

Opening pakhatah controlled ventilation mamawhna casement window thlang rawh. Operation a ngai lo va, view a pawimawh zawkna hmunah fixed window thlang rawh. Project tam takah chuan an pahnih hian an hmang vek a ni.

Casement Thli luh theihna turin hawn a ni.
Fixed En theihna leh ni eng atan khar a ni.
Combination Operability chu hna a neihna hmunah chauh a dah.

Opening hna atang hian tan la rawh

Second 30 chhungin duhthlanna hmasa ber siam rawh.

Frame, glass, emaw hardware emaw i khaikhin hmain he hawnna hian boruak a luh a ngai em tih chu rel rawh.

Ventilate theihna tur opening i mamawh em?

Casement window hmangin tan la rawh. Tichuan sash path kimchang, handle reach, screen, blind, furniture, leh exterior clearance te enfiah rawh.

Operable tan tir rawh

Opening a ngai lo em ni?

Fixed window hmangin tan la rawh. Tichuan glass inthenna te, a luhna tur tihfai te, tui chhuahna tur te, leh a tawpah glass thlak theihna tur kawng te chu chinfel rawh.

Fixed tan a ni

View leh localized airflow i mamawh em?

View area lian zawk chu fix takin dah la, ventilation hman theihna leh enkawl theihna hmunah operable sash dah rawh.

Mix pakhat nen khaikhin rawh

Side-by-side a awm a

Casement vs fixed windows: danglamna pawimawh tak tak.

A danglamna ber chu operation a ni. Casement sash pakhat a inhawng a; fixed window chuan a ti lo. Chu inthliarna pakhat chauh chuan boruak luh dan, clearance, access leh maintenance a tidanglam a ni.

Product family thlan hmain opening-a nitin hna thawh dan tehkhin hmasa phawt ang che.
Thutlukna siamna factor Casement window Fixed window
HmalaknaSide-hinged hmanga hnathawh theih sashGlazed unit hman theih loh
Ventilation a awm theih nanAirflow tur hawnna a siamVentilation route dang ah a innghat
ThlirGlazing chiang tak sash, frame, leh hardware mamawhna nenOpening mamawh lohna hmuna uninterrupted glazing tan bul tanna tur
Clearance a niKawng hawnna kawng inrual tak a mamawhSash swing a nei lo
EnkawlnaHardware, seal, screen, leh operation te hi access a ngai a niOperating hardware a awm lo; tihfai leh thlak danglam theihna chu a la pawimawh hle
Hetah hian engtikah ngeRoom emaw ventilation plan emaw chu hawn a ngai a niVentilation hi hmun dangah an buaipui thin

System thlan, glass, size leh operation atana documented whole-unit data tehkhin rawh. Opening type chauh hian project performance a din lo.

DERCHI showroom window-ah chuan fixed glazing bulah inward-open black sash a awm a

Route 01 / Hman theih a ni

Opening hian hna a thawh a ngai hunah casement thlang rawh.

Opening hian ventilation role ruat sa a neih laiin casement window hmangin tan la la, sash chu inhnialna siam lovin a thawk thei a ni.

Opening chu hna pe rawh

Sash hian nitin emaw, a chang chuan boruak a pe em tih emaw chhinchhiah rawh. Defined task nei lo opening chuan brief chiang lovin coordination a belhchhah a ni.

Sash path kimchang chu draw rawh

Counter, curtain, blind, furniture, screen, kalkawng, thing phun leh thil dang daltu te enfiah rawh. Record handing leh operator dinhmun.

Hun kal zelah access theihna tur ruahmanna siam rawh

Handle chu thlen theih turin siam la, hinge, lock, seal, screen, tihfai leh enkawl dan tur pawh phalsak rawh.

Bathroom chhung thim chhungah fixed picture window lian tak dah a ni

Route 02 / Hman theih loh

Opening chu a awm reng theih hunah fixed thlang rawh.

Hmun dangah boruak luh theihna tur window nghet tak hmangin tan la la, hawnna hna ber chu ni êng, view emaw architectural glazing emaw a ni.

View chu humhim rawh

Non-operable unit chuan brief atang hian sash movement a paih chhuak thin. Framing, mullions, glass, leh support conditions te hian final visible area chu a la ruat reng a ni.

Ventilation chu a hranin dah tur a ni

Airflow mamawh chinfel nan fixed pane dil suh. Opening dang emaw, project-a building-services strategy emaw hmangin boruak luh theihna tur pe rawh.

Selection hmain access tihfel hmasak phawt ang che

Glass hmai pahnih tihfai dan tur te, tui chhuahna tur a awm reng dan tur te, leh glass thlak danglam tur chuan a hawnna hmun a thlen theih dan tur te entir rawh.

Route 03 / Mixed a ni

Opening pakhatin hna pahnih a neih chuan a pahnih hian hmang rawh.

Fixed-and-operable arrangement chuan view lian zawk a humhim thei a, chutih rualin ventilation chu sash tenau zawk, thlen theih takah a concentrate thei bawk. System thlan, dimension, connection leh report scope te hi enfiah a la ngai a ni.

01
Fixed center, operable sides Primary view chu center-ah dah la, side-sash path pahnih chu enfiah rawh.
02
One focused opening Glazing tam zawk chu fixed takin dah la, airflow tangkaina hmunah reachable sash pakhat dah rawh.
03
Fixed base, operable section Sill san zawng, handle position, sash travel, leh room layout te coordinate rawh.
Fixed leh operable window configuration concept pathum Line diagram-ah hian fixed center, operable sides nei, fixed glazing bulah operable sash te tak te pakhat, leh operable upper section hnuaiah fixed lower panel a awm tih a lang. Fixed center / operable sides Fixed area / one focused opening Base nghet / hnathawh theih section OPEN OPEN OPEN OPEN
Selection concept chauh—structural drawing, approved size, model-specific configuration ni lovin.

Hmun hrang hrangah ruahmanna siam rawh

Window type inang hi hawnna apiangah a fit lo.

Room leh hawnna thil tih tur aangin tan la la, chu hmun chhehvela taksa lama harsatna awmte chu test rawh.

Chhawng hnih nei residential facade, window position hrang hrang awmna, central glazed entrance sang tak vel a awm Architectural illustration a ni a, roof edge hnuaia glazed band zau tak, fixed band a awm
01

Living room emaw primary view emaw a ni thei

Fixed emaw mixed emaw glazing hmangin tan la rawh. Ventilation source, glass divisions, shading, cleaning access, leh main seated view te chu nemnghet rawh.

02

Mutna pindan

Room brief-in hawn a mamawh hunah operable emaw mixed route hmangin tan la rawh. Privacy, screen, safe operation, leh tualchhung thil mamawh hman turte inrualrem.

03

Kitchen counter pakhat chungah chuan

Handle thlen theih a nih hunah chauh casement ngaihtuah tur a ni a, sash chu pawn lam nen a inrem lo ang. Plan-ah hian cleaning access te pawh telh bawk ang che.

04

High-level hawn a ni

Hmun danga ventilation enkawl a nih chuan fixed tan tur. Operation a pawimawh chuan hardware thlan hmain control leh maintenance access kha resolve hmasa phawt ang che.

05

Terrace emaw, kalkawng emaw bulah

Pawn lam hawia kal sash chu circulation-ah a lut em tih enfiah rawh. Operation chu reorient la, fixed section hmang la, clearance a tlem laiin route dang enfiah leh rawh.

Final selection neih hmain

Window hming chauh ni lovin, a hawnna kha check rawh.

Opening tin atan input inang chiah record la, chutiang chuan fixed, operable, leh mixed option te chu a awm reng thei ang.

Chhanna a chiang lo chuan room leh façade information a zawh hmaa product thlan tur nawr luih ai chuan a hawnna chu thutlukna siam loh anga chhinchhiah rawh.

  • ID hawnna, room, leh elevation reference te
  • Ventilation role leh hnathawh dan tur
  • Handing, opening direction, leh full sash path te pawh a awm bawk
  • In chhung leh pawn lama harsatna awm
  • Reach, screen, leh hardware mamawh te handle
  • Thianghlimna, tui chhuahna, leh glass-replacement access te
  • Opening dimension, unit, leh quantity tih zawh tawh
  • Glass, mimal chanchin, shading, leh himna atana thil tul te
  • Drawing hman tur, standard, leh report mamawh te

Comparison atanga project review thlengin

Duhthlanna chu hawnna schedule-ah chantir rawh.

DERCHI production workshop chhunga aisle pakhatah window-frame assembly dahkhawm a ni
Opening ID pakhat keng la, configuration review atanga production planning-ah schedule revision kalpui rawh.
  1. Operation ruahman chu mark rawh

    Opening tin chu fixed, operable, mixed, emaw undecided emaw tiin label rawh. Operable sash siam tura rawtna hmunah handing dah belh rawh.

  2. Room leh hawnna tur information te dah belh rawh

    Room hman dan, a dimension siam zawh tawh, a zat, chhungril lama harsatna, pawn lam thil tihkhawtlai, leh hmuh duh zawng te record rawh.

  3. Project brief chu attached rawh

    Plan emaw elevation emaw, glass leh finish mamawh, ventilation intent, performance target, leh document mamawh te pawh telh bawk ang che.

  4. Configuration pek tawh chu enfiah leh rawh

    Chhungkaw ruahmanna, ruahmanna, glass, hardware, lemziak, report, supply ramri, leh quotation input te sawiho rawh.

Zawhna zawh fo thin

Inthlauhna zawhna hnuhnung berte chu chinfel rawh.

Heng chhannate hmang hian opening type chu narrow la, chutah chuan system leh configuration thlan chu project brief nen en leh rawh.

DERCHI team member te chuan window display-ah project drawing an enfiah

A dawt leh tur chu

Window type dik tak chu opening tin ah map rawh.

I drawing te, opening schedule te, ventilation mamawh te, leh i duhzawng view te share rawh. DERCHI chuan eng opening nge fixed reng tur, eng opening nge hnathawh tur, leh engte nge combination anga hnathawk thei tih te a enfiah thei a ni.

  • Tuna ruahmanna, elevation, emaw hawn hun tur
  • Dimension, quantities, room hman dan, leh handling te
  • Ventilation, glass, finish, leh document mamawh te

Min rawn biak theih reng e

Kan professional leh experienced sales & technical team te nen eng project pawh unique window leh door designs custom made kan siam thei.
   WhatsApp / Tel: +86 15878811461 ah zawhfiah theih a ni
   Email ah hian: windowsdoors@dejiyp.com
    Address: Building 19, Shenke Chuangzhi Park, No. 6 Xingye East Road, Shishan khawpui, Nanhai District, Foshan khawpui China
DERCHI window and door hi China rama window leh door tha ber 10 zinga mi a ni. Kum 25 chuang zet professional team nen professional high quality aluminium kawngkhar leh window siamtu kan ni tawh.
Min zui rawh
Message pakhat hnutchhiah rawh
Copyright © 2026 DERCHI Thuneihna zawng zawng humhalh a ni. | Sitemap a ni | Thuruk humhalh dan tur