Retail glass kawngkhar a awm bawk.
vel a design a ni .
Trading ni
Nitin customer kal theihna tur aluminum-alloy framed glass kawngkhar te, dawr hmalam hawn leh interior retail zone te ruahman rawh. Store hawn dan, hnathawh dan leh khar dan atang hian tan la rawh.
I Retail Entrance chungchang sawiho rawhDERCHI showroom · kawngkhar leh profile tarlanna
01 / RAMRI THIL THAWN THIN
Display chu vawng reng rawh. Passage chu humhim rawh.
Retail glass kawngkhar hian dawr hmalam hmuh theih leh hman theih luhna kawngkhar a thlunzawm a ni. Mark chuan glazing, moving leaves leh customer route te chu plan khatah a fix a.
display glass
Kawngkhar luhna
parking a awm bawk
Lease line, swing emaw stack emaw footprint, leh floor level zawh tawhte chhinchhiahna.
General planning diagram · scale-a tih loh tur. Project team chuan clearance mamawh tur an siam thin.
Kawngpui lam hawi dawr
Condition tihfel dan: khaw lum leh khaw vawt a nih bakah sidewalk approach. Canopy chauh hian sill emaw water-management detail emaw a sawifiah lo.
Plan consequence: kawngkhar kal dan, pawn lam level leh drainage te entir rawh. Architect leh contractor te hian jamb, head leh sill interface te an coordinate thin.
Mall dawr hmaah a awm
Condition thutlukna siam: lease line inremna leh common route. Open leaf emaw folded stack emaw hian floor space tak tak a luah a ni.
Plan consequence: inremna ramri chhungah parking reserve. Mall engineering chuan frontage, threshold leh after-hours ruahmanna te a enfiah thin.
In chhung lam retail zone a ni
Condition tihfel dan: display fixtures, staff te hman dan leh dawr chhunga kalna tur kawng. A tlangpuiin glazed width hi hman theih tur passage a ni lo.
Plan consequence: active opening chu fixed glass atanga a hranin dimension rawh. Designer leh facilities team te hian handle, lock leh a bul hnaia thil zawrh te an coordinate thin.
02 / SUMDAWNNA NI
Frontage pakhat. Operating state hrang hrang a awm.
Mite hman tak tak passage vel chu thlang rawh; frontage pumpui hawn chu hna hran a ni.
Then
Leaf arc chu reserve la, hmun hnaih rawh.
Manual sliding a ni
Reserve lam hawia zin; panel inzawm khawm chuan a hawnna a ti tlem.
Folding a ni
Folded stack atan hian parking zone reserve rawh.
Movement principles chauh · scale emaw model drawing emaw siam loh
| Retail task | Selection direction | Hei hi plan-ah dah rawh |
|---|---|---|
| Nitin customer kalna |
Approach space a awm theihna hmunah active swing leaf hmangin tan la rawh. Swing arc leh layout a inthlau a nih chuan manual sliding hi khaikhin rawh.
|
A hman theih opening chu normal operating position-ah dimension rawh. Closing leh latch operation te pawh a tel.
|
| An open trading frontage |
Frontage hawn hunah compare folding hi dawr operating plan-ah a tel a ni.
|
Parked stack leh frontage khar laia passage awm chu draw rawh.
|
| Replenishment & carts |
Cart route hmangin clear opening, turn leh threshold transition te chu enfiah rawh.
|
Cart dimension leh replenishment hun tur sawi rawh. Chu kawngpui atang chuan thil zawrh leh parked leave te chu chhuah tir rawh.
|
| After-hours closing |
Tuin nge eng lam atanga lock nge tih te, a tuk zingah dawr hawn dan tur te tarlang bawk ang che.
|
Locking request chu project team-in egress emaw access-control requirement emaw a siam apiang aangin thliar hran rawh.
|
Automatic primary luhna tur i mamawh em? Powered entrance kimchang, sensor, control leh document mamawh te chu system scope hran ah dah rawh. A chunga manual arrangements te hian automatic entrance specification a siam lo.
03 / DERCHI CONFIGURATION THIL AWM DAN THIL AWM DAN
Focused shortlist atan bul tanna tur pahnih.
Opening frontage atan folding reference hmang la, defined passage atan swing reference hmang bawk ang che. Source page pahnihah hian 6063-T5 aluminum-alloy frame tarlan a ni.
OPEN-FRONT THIL AWM DAN
80 Series folding siam dan tur ruahmanna siam a ni
Hetah hian dawr chu hawnna zau tak hmanga sumdawnna atana ruahman a nih laiin tan la la, plan-ah chuan folded panels park theihna tur hmun a awm bawk.
- Parking
- Veilam, dinglam emaw, split stacking emaw; chhung lam emaw pawn lam emawa folding.
- Sill choice
- High, low leh waterproof-low track options tihchhuah a ni.
- Appearance
- Glass leh frame finish te hi configuration dilnaah hian a tel ve a ni.
Shortlist hmain thutlukna siam rawh: parked stack chu plan nen a inmil tur a ni. Frontage khar laiin nitin kalna tur a ngai a nih chuan chu kalna tur ruahmanna chu a hranin hriat chian rawh.
80 Series folding configuration chu chhui rawh ↗
DEFINED-PASSAGE THIL AWM DAN THIL AWM DAN
P103 swing layout hrang hrang a awm
Hetah hian active leaf chuan approach emaw store fixtures emaw nena inrem lovin a tum chu a rawng a bawl theih hunah tan la rawh.
- Leaf layout
- Single, double leh unequal paired leaves te hi published option a ni.
- Display edge
- Sidelight ruahmannaah chuan kawngkhar bulah fixed glazing a awm thei.
- Appearance
- Glass leh frame finish te chu layout ruahman atan hian tarlan theih a ni.
Shortlisting hmain chinfel hmasa phawt ang che: active leaf-a clear opening, swing arc leh closing hardware te enfiah rawh. Paired-door frontage hian nitin hman theih tur hawnna a sawifiah lo.
P103 swing layouts te chu chhui chhuak rawh ↗Side travel hi a pawimawh em? Enquiry-ah hian manual sliding arrangement telh la, panel travel, opening clear la awm leh sill mamawh te dah tel bawk ang che. Chu scope atan chuan matching system proposal dil rawh.
Candidate Configuration chungchang sawiho rawh04 / PLAN CHU INPUTS-ah TURIN
ID hawnna pakhat. Coordinated specification pakhat.
Dimension, glass, finish leh hardware te chu dah khawm la, chutiang chuan proposal te chu brief inang nen khaikhin theih a ni.
| Schedule field | Eng nge luh | tur Proposal a thlak chhan |
|---|---|---|
| Opening ID & location |
Kawngkhar ID, dawr/phase, kawngpui / mall / chhung lam, a zat.
|
Configuration tin leh a hnu lama inthlak danglamna te chu hawnna dik takah a inzawm tlat thin.
|
| Dimensions & basis |
A hawn zawh tawh W × H, unit, floor level; mark survey emaw design dimension emaw a ni.
|
Building chhunga opening chu frame size leh usable passage atanga thliar hrang.
|
| Movement & passage |
Active leaf, handing, clear-opening target, stack/slide parking leh cart kalna tur te a awm bawk.
|
Eng layout nge hman dan pangngaiah leh replenishment neih laiin a inmil tih a entir.
|
| Sill & surrounding work |
Threshold duh zawk, a kianga floor build-up, head/jamb support, a awmna hmuna drainage.
|
Sill detail thlan hmaa inremna siam tur interface a pholang.
|
| Glass & performance |
Glass build-up emaw target emaw mamawh, project standard kaihhnawih leh report dil te.
|
Glazing ruahman leh kawngkhar document kimchang chuan eng nge a ngaihtuah tur tih a sawifiah.
|
| Finish & operation |
Color reference, gloss/texture, sample dilna te; handle, locking, hnaih zawk/access-control mamawh a ni.
|
A lan dan leh nitin hnathawhna atana mamawh chu quote theih thilah a chantir.
|
DERCHI range component hrang hrangte chu a entir a. System ruahman angin handle, roller leh track tak tak thlang rawh; hmel lan dan chauh hian inmilna a siam lo.
05 / ASSEMBLY CHU ENGTIN NGE KAN ennawn
Glass report chu kawngka hmun khat chauh a ni.
Assembly ruahman, a document leh project interface te hian configuration inang chiah chiah a sawifiah a ngai a ni.
Project target leh standard hman tur hriatchhuah.
Record system, drawing revision leh ID hawnna te a awm bawk.
Specimen sawifiahna leh report scope chhiar rawh.
Size, glass, hardware, sill emaw installation danglamna te chinfel.
| Project mamawh | Document & matching fields | Mawhphurhna thlirletna |
|---|---|---|
| Glass mamawh |
Glass specification leh a kaihhnawih glass report
Build-up, thickness, treatment, coating leh report-in a hriat chhuah product. |
Designer chuan mamawh a sawifiah a; supplier chuan glass ruahman chu a hriat chian tir thin.
|
| Door performance emaw access mamawh |
Kawngkhar pum pui report hman tur, drawing leh hardware data
System, specimen size, leaf arrangement, glass, frame, seal, hardware leh sill; standard leh report ID a ni. |
Architect/specifier hian project-a hman theih dan tur a zirchiang thin.
|
| Building interface |
Coordinated plan leh head/jamb/sill sections
Support, anchorage, finished levels, drainage, a kianga glazing leh installation condition te. |
Contractor leh design team te chuan product supplier nen interface an inrem a.
|
Review rule angkai tak: glass-only document chuan frame, lock, sill emaw installed entrance emaw performance a siam thei lo. 'low track' sawifiahna hian accessible threshold a siam lo. Project team-te chu ruahmanna siam kim tawh chu endik tir rawh.
System reference atan 2026 DERCHI product catalog ↗ hawng rawh . A bulah hian configuration ruahman nena inzawm document dil rawh.
06 / I SPECIFY HMASA
Order thlak danglam thei tur details te chu chinfel sak rawh.
07 / I PROJECT CHHUAHNA
Opening plan chu thawn rawh.
Sawihona lo awm tur chu chiang takin sawi rawh.
DERCHI hnenah eng operating state nge pawimawh ber tih hrilh rawh. System ruahman, hawnna ruahmanna, sill leh hardware configuration, document kaihhnawih, leh itemized quotation scope te zawt rawh.
Retail Project Review dil rawhCoordinated project package pakhat buatsaih rawh
- Project & location
- Ram/khawpui, dawr emaw project chi hrang hrang, new build emaw retrofit emaw, project contact.
- Openings & quantities
- Plan emaw hawn hun tur emaw; ID hawn te; dimension leh unit siam zawh tawh; quantity chu store emaw phase emaw a ni.
- Operation & appearance
- Nitin kal tlang, open-front hman, hand/parking, lock operation, glass leh performance target, finish.
- Documents & decisions
- Report emaw sample mamawh te, delivery destination/trade terms, target decision date leh phased release mamawh te.