Please Choose Your Language
Tunlai chenna in a ni a, aluminum window division pawh black-framed repeated a ni
DERCHI / Architect leh window consultant te tan

Aluminum Window Elevation hrang hranga awm theihna tur Window Mullion Design

Design elevation chu aluminum window configuration enfiah theihah chantir rawh. Quotation hmain pane division, fixed leh operable casement, mullion position leh drawing reference te coordinate thin ang che.

Casement-led configurations Opening a tul lohna hmunah fixed glazing Drawing set pumpuiah hawnna ID pakhat
Line dik tak hmangin tan rawh

Detail i thlan hmain division hming sawi hmasa phawt ang che.

Window elevation-a line zawng zawng hi condition inang vek a ni lo. Profile emaw dimension emaw sawiho hmain mullion, transom, meeting stile emaw decorative muntin emaw a entir em tih hriat hmasa phawt ang che.

Mullion chuan a rawn ti a

Window section emaw unit emaw inkara vertical division emaw joining condition emaw.

Transom a ni

Glazed section hrang hrang inkara horizontal division.

Meeting stile a ni

Operable leaves inkara meeting condition hmuh theih.

Muntin / grille hmanga siam a ni

Glass pattern nena inzawm decorative emaw divided-light element tenau zawk.

He page hian aluminium window assembly leh an drawing coordination te a sawi a. Curtain-wall leh window-wall engineering-ah hian system hranpa leh project review neih a ngai a ni.

Bay tin ah hna pakhat dah rawh
Design driver 01. A rilru a hah lutuk chuan a rilru a buai em em a

Elevation chu mawhphurhna hmangin sem rawh—equal spacing chauh hmang lovin.

Grid i siam that hmain glazed bay tin hian room leh façade-a eng nge an thawh ve tur tih record hmasa phawt ang che. Rhythm repeated hian mawhphurhna fixed leh operable hrang hrang a la nei thei tho.

V

Thlir

Eng hmun nge main interior viewpoint atanga hmuh theiha hawn reng tur?

D

Ni eng

Eng part nge frame intersection tul lo tak tak awm lovin glass area tangkai tak mamawh?

ANI

Ventilation a awm theih nan

Khawiah nge project brief hian operable casement a mamawh tak tak?

R. A rilru a hah lutuk

Reach leh operation

Handle leh full sash movement hi ding dinhmun nen a inmil thei ang em?

C. A rilru a buai em em a

In chhung lam atanga clearance a awm

Blinds, furniture, partition emaw circulation emaw hian sash path hi a luah em?

M

Faina leh thlak danglam

Engtin nge glass face leh a tawpah thlakna tur kawng pahnih hi a kal theih ang?

Project team hian nunna himna, thlen theihna, boruak luh theihna leh enkawl dan tur an siam a ni. Chu criteria chu product review hmain window brief define nan hmang rawh.
Design driver 02 a ni

Mullion layout i tihthianghlim hmain opening route kha thlang hmasa phawt ang che.

Opening a tul lohna hmunah fixed glazing hmang rawh. Ventilation tumna casement ngaihtuah la, project hian reach, swing, hardware leh a chhehvel clearance te a coordinate thei ang. An pahnih hi an hmuh theih leh technical interface hriatthiam a nih hnuah chauh inzawm khawm rawh.

Line drawing-ah hian window configuration fixed leh operable hrang hrang tarlan a ni
A chhunga inhawng casement sash bulah black-framed fixed glazing a awm bawk
01 / FIXED a ni

Glazing siam that a ni

Hetah hian bay hi hmuhnawm emaw ni êng emaw atan a nih ber laiin tan la la, hmun dangah boruak luh theihna tur a awm bawk.

Coordinate siam rawh

Pane size, glass build-up, support condition, tihfai theihna tur leh thlak dan tur.

02 / HMAN THEIH THIN

Casement hman theih a ni

Hetah hian brief-in hawnna a mamawh hunah tan la la, sash chu inhnialna awm lovin a thawk thei a ni.

Coordinate siam rawh

Handing, handle position, sash arc, hardware, screen leh closed/open condition te a awm thei bawk.

03 / THIL THAWN THIN

Inremna inzawmkhawm (combined arrangement) a ni

Hetah hian fixed composition lian zawk bulah emaw, a chhungah emaw controlled opening a mamawh hunah tan rawh.

Coordinate siam rawh

Frame leh sash sightline, division, glass alignment, drainage leh detail reference te a awm bawk.

Configuration inputs a awm bawk

Mullion line hi project input inzawmkhawm atanga lo chhuak a ni.

Elevation hian design intent a siam a, mahse ruahmanna siam chu window system thlan bik leh project criteria nena khaikhin a la ngai a ni.

01

Geometry hawnna a ni

A zau zawng × san zawng, unit, level leh a kianga sak zawh tawh.

02

Pane leh sash inthenna te

Fixed/operable pattern rawt leh module logic tih nawn leh.

03

Glass rawtna siam a ni

Configuration enfiah mek atana build-up, weight leh edge conditions te.

04

Operation leh hardware hman dan

Handing, sash movement, control, screen leh hardware mamawh a ni.

05

Project tehfung hrang hrang

Project team-in performance leh regulatory requirement a siamte.

06

Support leh interface te pawh a awm bawk

Perimeter support, wall, a kianga frame, drainage leh installation mawhphurhna te a ni.

Conceptual elevation hi structural calculation emaw allowable-size table emaw atan hmang suh. Project atana system thlan, configuration leh document scope te chu nemnghet rawh.
Frame logic hmuh theih a ni

Aligned center line hian hmuh theih zau zawng inang tlang a tichiang lo.

Fixed frame, operable sash, meeting condition leh coupled frame pahnih hian aluminum hmuh theih zat hrang hrang a siam thei a ni. Line tin hi inthlak danglam theih anga ngaih hmain elevation leh section-a condition ruahmante chu khaikhin hmasa phawt ang che.

Brick apartment façade-ah hian dark-framed window repeated leh proportion hrang hrang a awm

Frame siam that a ni

Stationary glazing vel frame pakhat condition a awm.

Frame + sash a ni

Operable component dangte chuan hmuh theih line chu a thlak danglam thin.

Meeting neih dan tur

Leaf edge pahnih leh hardware hian reading a tizau thei.

Frame inzawmkhawm (coupled frame) a awm

Frame pahnih inzawm chuan center condition zau zawk a siam thei.

Elevation-ah enfiah leh rawh

  • Vertical lian ber berte chu a remchan dan angin façade grid, wall joint leh interior partition te nen inzawm tir rawh.
  • Opening repeated zawng zawngah sill leh head inzawmna enfiah rawh.
  • Frame rhythm chu pawn lam leh chhung lam thlirna bulpui aangin thlirlet leh rawh.

Chipchiar takin enfiah leh rawh

  • Line chu mullion, frame-plus-sash condition emaw, a kianga frame emaw a nih leh nih loh hriat chian.
  • Center line pakhata innghat lovin glass edge leh visible profile te khaikhin rawh.
  • Eng detail nge repeated condition tin control tih chhinchhiah rawh.

Building context hian hawn nawn fo thinte architectural reading a entir a. Concept diagram hi scale tur a ni lo va, DERCHI profile pawh a prescribe lo.

Drawing coordination a ni

Opening ID pakhat hian assembly view zawng zawng a connect vek tur a ni.

Elevation, plan, head/jamb/sill section, mullion emaw coupling details leh opening schedule zawng zawngah opening ID leh revision inang hmang rawh.

E

Elevation a ni

Dimensions, divisions, fixed/operable assignment, pek dan leh detail reference te a awm bawk.

P

Duang

Wall position, reveal, frame relationship, sash swing leh a bul hnaia clearance te a awm bawk.

H/J/S

Lu / jamb / sill

Perimeter interface, support, drainage path leh installation mawhphurhna te a ni.

M

Mullion / inzawmna

Internal line tin hian a entir detail condition tak tak.

W-07 a ni

Hawnna hun tur ruahman

Configuration, quantity, glass intent, finish, hardware, criteria leh revision te a ni.

Architect te tana DERCHI Support en rawh
Entirnan schedule record atan

W-07 hi hmun tinah awmzia inangah siam rawh.

Opening record tangkai tak chuan drawing team leh window supplier te chu sawihona tur current description pakhat a pe a ni. Division, sash, glass emaw size emaw a inthlak chuan proposal i khaikhin hmain chu record chu revise hmasa phawt ang che.

Field W-07 ruahmanna siam luhna
hmunChhim lam elevation / meeting room
hawn a niA zau zawng × san zawng leh unit
Quantity tihfel tawh te dah laTuna quantity awm mek chu add
ConfigurationFixed center bay ah chuan operable casement pakhat a awm a; chu a hlan tih nemnghet
Glass tum Project glass brief leh document mamawh basis te dah belh
FinishApproved colour/sample reference
Hardware tih a niOperation, control, screen leh handle mamawh te dah belh
CriteriaProject performance leh regulatory requirements
te Details te dah belhLu, jamb, sill leh mullion/connection reference te dah belh
RevisionTuna drawing issue leh change note a awm mek

Planning entirnan chauh. Configuration review hmain project input zawng zawng chu thlak vek tur a ni.

Worked planning entirnan

Step nga chuan façade line chu window sawihona tangkai takah a chantir a.

W-07 entîrna hian zawhnate chu a buatsaih dân a târ lang a—window pakhat size emaw, engineer emaw siam dân a târ lang lo.

DERCHI team te chuan project drawing lian tham tak tak an enfiah

Opening leh façade grid siam rawh

Opening zawh tawh, sill/head level, project unit leh architectural line window-in a chhan tur te chu mark rawh.

Bay tin ah hna pakhat dah rawh

View, daylight leh ventilation mawhphurhna hriatchhuah; operation a tul lohna emaw, room nena inrem lohna hmun emaw chhinchhiahna.

Fixed leh casement portion te chu rawt rawh

Handing leh full sash movement entir rawh. System leh project inputs te enfiah a nih hma chuan ruahmanna chu provisional-ah dah rawh.

Detail reference te chu attached rawh

Perimeter leh internal condition tin chu head, jamb, sill emaw mullion/connection reference-ah connect rawh.

Update W-07 leh siamthat a ni

Configuration inremna, glass intent, finish, hardware, criteria leh change note te chu opening schedule-ah keng lut rawh.

Ka Window Elevation chu enfiah leh rawh

Original planning entirnan—dawr drawing, structural calculation emaw sizing recommendation emaw ni lovin.

Mawhphurhna map

Design, product leh site chungchanga thutlukna siamte chu neitu dik takah dah rawh.

Coordinated package chuan drawing-te chu quotation emaw production emaw lam a pan hmain mawhphurhnate chu a lang thei a ni.

01 / Architect a ni

Design tum leh inremna siam

Opening locations, appearance, operating intent, project criteria leh coordinated drawing/schedule reference te a set thin.

02 / Consultant te an ni

Technical scope ruat a ni

Structural, envelope, energy, acoustic, fire, accessibility leh local regulatory requirement te din leh enfiah.

03 / DERCHI sawihona neih a ni

Product leh configuration kalpui dan tur

Project information a enfiah a, inremna siam stage atana system information, drawing, sample emaw document emaw a kaihhnawih te a hmuchhuak thin.

04 / Contractor & installer te an ni

Site dinhmun leh a awm dan tur

Opening, substrate, interface, tolerance, access leh installation sequence te chu approved information nen a finfiah thin.

DERCHI configuration sawihona hian architect emaw consultant emaw project design, engineering emaw local approval mawhphurhna a thlak lo.
I submit hmain

Configuration review hmaa architect-te zawhna

Mullion chu vertical division emaw joining condition emaw a ni a; a transom chu a dinglam (horizontal) a ni a; meeting stile chu operable leaves inzawmna hmunah a awm a; tin, muntin emaw grille emaw chuan glass pattern chu a subdivide bawk. Detail i thlan hmain line tin hian eng nge a entîr tih finfiah hmasa phawt ang che.
Drawing i neih atang hian tan la rawh

I coordinate elevation chu thawn rawh.

Tuna window elevation leh opening schedule te chu share ve rawh. DERCHI chuan i hnenah information chu a enfiah thei a, fixed/casement configuration route kaihhnawih chungchang a sawiho thei a, project atana drawing leh document zawhna lo awm tur chu a pawm thei bawk.

  • Project awmna hmun leh building context
  • Tuna elevation, ruahmanna leh schedule te
  • Opening dimension leh unit te chu a zo tawh
  • Fixed/operable tum leh pek chhuah
  • Glass, finish, hardware leh screen intent te a ni
  • Performance leh regulatory criteria te a ni
  • Interface emaw sightline emaw zawhna chinfel loh
  • Tuna revision leh target decision stage
Tunlai chenna in, black-framed window division hrang hrang inzawmkhawm

Min rawn biak theih reng e

Kan professional leh experienced sales & technical team te nen eng project pawh unique window leh door designs custom made kan siam thei.
    WhatsApp / Tel: +86 15878811461 ah zawhfiah theih a ni
   Email hmanga thawn: windowsdoors@dejiyp.com
    Address: Building 19, Shenke Chuangzhi Park, No. 6 Xingye East Road, Shishan khawpui, Nanhai District, Foshan khawpui China
DERCHI window and door hi China rama window leh door tha ber 10 zinga mi a ni. Kum 25 chuang zet professional team nen professional high quality aluminium kawngkhar leh window siamtu kan ni tawh.
Min zui rawh
Message pakhat hnutchhiah rawh
Copyright © 2026 DERCHI Thuneihna zawng zawng humhalh a ni. | Sitemap a ni | Thuruk humhalh dan tur