Please Choose Your Language
Contemporary residence with repeated black-framed aluminum window divisions
DERCHI / For architects and window consultants

Window Mullion Design for Coordinated Aluminum Window Elevations

Turn a design elevation into a reviewable aluminum window configuration. Coordinate pane divisions, fixed and operable casements, mullion positions and drawing references before quotation.

Casement-led configurations Fixed glazing where opening is unnecessary One opening ID across the drawing set
Start with the right line

Name the division before selecting a detail.

Not every line in a window elevation is the same condition. Identify whether it represents a mullion, a transom, a meeting stile or a decorative muntin before discussing profiles or dimensions.

Mullion

A vertical division or joining condition between window sections or units.

Transom

A horizontal division between glazed sections.

Meeting stile

The visible meeting condition between operable leaves.

Muntin / grille

A smaller decorative or divided-light element associated with the glass pattern.

This page addresses aluminum window assemblies and their drawing coordination. Curtain-wall and window-wall engineering require a separate system and project review.

Assign a job to every bay
Design driver 01

Divide the elevation by responsibility—not by equal spacing alone.

Before fixing the grid, record what each glazed bay must contribute to the room and façade. A repeated rhythm may still contain different fixed and operable responsibilities.

V

View

Which areas should remain visually open from the main interior viewpoints?

D

Daylight

Which parts need useful glass area without unnecessary frame intersections?

A

Ventilation

Where is an operable casement actually required by the project brief?

R

Reach and operation

Can the handle and full sash movement be coordinated with the standing position?

C

Interior clearance

Do blinds, furniture, partitions or circulation occupy the sash path?

M

Cleaning and replacement

How will both glass faces and the eventual replacement route be accessed?

The project team sets life-safety, accessibility, ventilation and maintenance requirements. Use those criteria to define the window brief before product review.
Design driver 02

Choose the opening route before refining the mullion layout.

Use fixed glazing where opening is unnecessary. Consider a casement where ventilation is intended and the project can coordinate reach, swing, hardware and surrounding clearances. Combine the two only after their visible and technical interfaces are understood.

Line drawings showing a range of fixed and operable window configurations
Black-framed fixed glazing beside an inward-opening casement sash
01 / FIXED

Fixed glazing

Start here when the bay is primarily for view or daylight and ventilation is provided elsewhere.

Coordinate

Pane size, glass build-up, support conditions, cleaning access and replacement route.

02 / OPERABLE

Operable casement

Start here when the brief requires an opening and the sash can operate without conflicts.

Coordinate

Handing, handle position, sash arc, hardware, screens and closed/open conditions.

03 / COMBINED

Combined arrangement

Start here when a controlled opening is needed beside or within a larger fixed composition.

Coordinate

Frame and sash sightlines, divisions, glass alignment, drainage and detail references.

Configuration inputs

A mullion line is an outcome of connected project inputs.

The elevation establishes design intent, but the proposed arrangement still needs to be reviewed against the selected window system and project criteria.

01

Opening geometry

Finished width × height, units, levels and adjacent construction.

02

Pane and sash divisions

Proposed fixed/operable pattern and repeated module logic.

03

Glass proposal

Build-up, weight and edge conditions for the configuration under review.

04

Operation and hardware

Handing, sash movement, control, screen and hardware requirements.

05

Project criteria

Performance and regulatory requirements established by the project team.

06

Support and interfaces

Perimeter support, walls, adjoining frames, drainage and installation responsibility.

Do not use a conceptual elevation as a structural calculation or an allowable-size table. Confirm the selected system, configuration and document scope for the project.
Visible frame logic

Aligned centre lines do not guarantee equal visible widths.

A fixed frame, an operable sash, a meeting condition and two coupled frames can produce different amounts of visible aluminum. Compare the proposed conditions in elevation and section before treating every line as interchangeable.

Brick apartment façade with repeated dark-framed windows and varied proportions

Fixed frame

One frame condition around stationary glazing.

Frame + sash

Additional operable components change the visible line.

Meeting condition

Two leaf edges and hardware can widen the reading.

Coupled frames

Two adjoining frames may create a broader centre condition.

Review in elevation

  • Relate major verticals to the façade grid, wall joints and interior partitions where appropriate.
  • Check sill and head relationships across repeated openings.
  • Review frame rhythm from the main external and internal viewpoints.

Review in detail

  • Identify whether the line is a mullion, frame-plus-sash condition or adjoining frames.
  • Compare glass edges and visible profiles rather than relying on one centre line.
  • Mark which detail controls every repeated condition.

Building context shows the architectural reading of repeated openings. Concept diagrams are not to scale and do not prescribe a DERCHI profile.

Drawing coordination

One opening ID should connect every view of the assembly.

Use the same opening ID and revision across the elevation, plan, head/jamb/sill sections, mullion or coupling details and the opening schedule.

E

Elevation

Dimensions, divisions, fixed/operable assignment, handing and detail references.

P

Plan

Wall position, reveal, frame relationship, sash swing and nearby clearances.

H/J/S

Head / jamb / sill

Perimeter interfaces, support, drainage path and installation responsibilities.

M

Mullion / connection

The actual detail condition represented by each internal line.

W-07

Opening schedule

Configuration, quantity, glass intent, finish, hardware, criteria and revision.

See DERCHI Support for Architects
Example schedule record

Make W-07 mean the same thing everywhere.

A useful opening record gives the drawing team and window supplier one current description to discuss. When a division, sash, glass or size changes, revise that record before comparing proposals.

FieldW-07 planning entry
LocationWest elevation / meeting room
OpeningAdd finished width × height and units
QuantityAdd current quantity
ConfigurationFixed centre bay with one operable casement; confirm handing
Glass intentAdd project glass brief and required document basis
FinishAdd approved colour/sample reference
HardwareAdd operation, control, screen and handle requirements
CriteriaAdd project performance and regulatory requirements
DetailsAdd head, jamb, sill and mullion/connection references
RevisionCurrent drawing issue and change note

Planning example only. Replace every project input before configuration review.

Worked planning example

Five steps turn a façade line into a useful window discussion.

The W-07 example shows how to organize the questions—not how to size or engineer a window.

DERCHI team reviewing large-format project drawings

Establish the opening and façade grid

Mark the finished opening, sill/head levels, project units and architectural lines the window should respond to.

Assign a job to every bay

Identify view, daylight and ventilation responsibilities; mark where operation is unnecessary or conflicts with the room.

Propose fixed and casement portions

Show handing and full sash movement. Keep the arrangement provisional until system and project inputs are reviewed.

Attach the detail references

Connect each perimeter and internal condition to a head, jamb, sill or mullion/connection reference.

Update W-07 and the revision

Carry the agreed configuration, glass intent, finish, hardware, criteria and change note into the opening schedule.

Review My Window Elevation

Original planning example—not a shop drawing, structural calculation or sizing recommendation.

Responsibility map

Keep design, product and site decisions with the right owner.

A coordinated package makes responsibilities visible before drawings move toward quotation or production.

01 / Architect

Design intent and coordination

Sets opening locations, appearance, operating intent, project criteria and coordinated drawing/schedule references.

02 / Consultants

Appointed technical scope

Establish and review structural, envelope, energy, acoustic, fire, accessibility and local regulatory requirements.

03 / DERCHI discussion

Product and configuration route

Reviews project information and identifies relevant system information, drawings, samples or documents for the agreed stage.

04 / Contractor & installer

Site conditions and sequence

Verifies openings, substrates, interfaces, tolerances, access and installation sequence against approved information.

A DERCHI configuration discussion does not replace the architect's or consultant's project design, engineering or local approval responsibilities.
Before you submit

Questions architects ask before configuration review

A mullion is a vertical division or joining condition; a transom is horizontal; a meeting stile occurs where operable leaves meet; and a muntin or grille subdivides the glass pattern. Confirm what each line represents before selecting a detail.
Start with the drawings you have

Send the elevation you are coordinating.

Share the current window elevation and opening schedule. DERCHI can review the information with you, discuss a relevant fixed/casement configuration route and agree the next drawing and document questions for the project.

  • Project location and building context
  • Current elevations, plans and schedule
  • Finished opening dimensions and units
  • Fixed/operable intent and handing
  • Glass, finish, hardware and screen intent
  • Performance and regulatory criteria
  • Unresolved interface or sightline questions
  • Current revision and target decision stage
Contemporary residence with coordinated black-framed window divisions

Contact Us

We can custom made to any project unique window and door designs with our professional and experienced sales & technical team.
   WhatsApp / Tel: +86 15878811461
   Email: windowsdoors@dejiyp.com
    Address: Building 19, Shenke Chuangzhi Park, No. 6 Xingye East Road, Shishan Town, Nanhai District, Foshan City China
DERCHI window and door is one of top 10 windows and doors in China. We are professional high quality aluminum doors and windows manufacturer with professional team for more than 25 years.
Follow Us
Leave a Message
Copyright © 2026 DERCHI All Rights Reserved. | Sitemap | Privacy Policy