Built around your North American project
Aluminum Sliding Doors for North American Projects
Plan exterior sliding doors for U.S. and Canadian projects. Compare DERCHI systems around your opening, glazing, threshold and performance requirements.
FOR BUILDERS · ARCHITECTS · PROJECT BUYERS
A clearer starting point
Start with the project,
not just the door size.
On this page
Custom homes
Balance views with everyday access, the opening side, screens and the transition to a patio or terrace.
Repeated project openings
Coordinate a consistent door schedule, glazing and hardware across units, with packing and delivery planned by opening.
Exposed exterior openings
Start with the site’s wind, rain and thermal requirements. Let the applicable system details guide the selection.
Selected systems
Two directions. A project-specific choice.
Compare these exterior sliding-door options first, then refine the panel arrangement, sill and glazing for your project.

WT-143 Sliding Door
Consider WT-143 when a two- or three-track layout fits the opening. Coordinate its 143 mm or 217 mm frame width with wall depth, floor finishes and clear passage.
View WT-143 system details
WT-150 Panoramic Sliding Door
Explore WT-150 when the design calls for more track options. Compare the 135 mm, 233 mm and 316 mm frame layouts with the panel stack and available floor depth.
View WT-150 system detailsLayout & usable space
Plan how the panels move.
A large glazed opening and a large clear passage are different design goals. Define both before selecting the panel arrangement.
The prepared building opening. Allowances, support and tolerances belong in the project drawings.
The manufactured frame size and track depth, coordinated with the wall and finished floor.
The usable space when open, after fixed panels, overlap, stops, handles and screens are accounted for.
More tracks can change panel stacking, but also increase frame depth. Review panel weight, handling access and the selected system drawing together.
Discuss my opening layout
Thresholds & water control
A considered transition.
A coordinated sill.
Low thresholds and a continuous floor need to work with the opening’s exposure, sill construction and drainage route. Choose the detail around how the space is used—and where rainwater goes.
- Sheltered patio: coordinate the cover, exterior floor fall and drainage outlet.
- Direct weather exposure: compare the applicable sill detail and water-test conditions.
- Accessible route: check clear passage, threshold geometry and operating requirements against the project specification.
A flush appearance alone does not establish water resistance or accessibility compliance.
Coordinate my sill requirementsGlazing & thermal performance
Choose the complete
door-and-glass system.
Thermal breaks and Low-E glass are parts of the solution. Use the whole-door U-factor and SHGC for the selected frame, glass and configuration when comparing your project’s energy requirements.
- Heat loss: a lower whole-product U-factor indicates less heat transfer.
- Solar exposure: choose SHGC with orientation, shading and daylight in mind.
- Weight & operation: thicker or additional glazing changes panel weight, hardware and handling needs.
Condensation also depends on indoor humidity, surface temperature and installation. Acoustic ratings must use the same test metric and configuration.

Project documentation
The right system. The right documents.
Match each document to the proposed door, glazing and opening configuration—not just the manufacturer’s name.
For U.S. projects
Review the applicable whole-product energy ratings and the project’s air, water and structural requirements. Where regional approvals are needed, check the approval number, model and installation limits.
U.S. window and door project supportFor Canadian projects
Review whole-product thermal data, the applicable NAFS and Canadian supplement information, and the requirements adopted for the province and project. Residential ENERGY STAR eligibility is a separate check.
Canada window and door project supportBuild a useful submittal package.
Identify the system, glazing, configuration, test size, report numbers and applicable limits. Include the sill and installation details for the proposed opening.
Start with the product range: Download the 2026 DERCHI catalog · PDF, 55 MB
Reference configurations
Compare the construction that matters.
These named catalog configurations are a starting point for discussion. Final dimensions, glass and hardware are coordinated with your project.
| Configuration | WT-143 | WT-150 |
|---|---|---|
| Track options | Two / three tracks | Two / three / four tracks |
| Frame width by track option | 143 / 217 mm | 135 / 233 / 316 mm |
| Profile thickness | 2.2 mm | Frame 2.0 mm / door leaf 3.0 mm |
| Catalog glass build-up | 5 + 27A + 5 mm | 6 + 25A + 6 mm |
| Glazing description | Double tempered, argon-filled | Double tempered, argon-filled |
| Continue selection | WT-143 details | WT-150 details |
Frame widths correspond to the track options in the order shown. Glass notation follows the catalog; “A” identifies the glazing cavity. Energy, air, water, structural and acoustic requirements must be checked against the applicable documents for the proposed configuration.

North American project reference
A villa project
in Las Vegas, USA.
DERCHI’s published Las Vegas villa project combines aluminum sliding doors, entry doors and fixed glazing. The construction-stage photographs show how multiple opening types come together within one building.
Coordinate the door schedule, frame interfaces and installation sequence as a complete project package.
View the Las Vegas projectFrom drawing to shipment
Keep the approved configuration in view.
Frame, glass and hardware choices need to stay consistent from the confirmed order through assembly and packing.

Assembly & operational checks
Coordinate dimensions, glazing, hardware and finish with the approved order. Define the checks and records required for your project before production.

Protection & packing
Agree the packing format, opening identification and handling requirements so the receiving team can plan unloading, storage and installation.
For repeat openings, keep the approved schedule and drawing revision consistent across the order.
See manufacturing & quality informationProcurement & project handoff
Make the quote—and the responsibilities—clear.
A comparable quotation starts with the same opening schedule, configuration and supply scope.
Share the opening schedule
Send the project location, building type, quantities, dimensions or drawings, and performance targets.
Agree the configuration
Align system, tracks, glass, finish, hardware and sill details. Identify the drawings and documents to review.
Set the supply scope
Itemize product, packing, freight terms, destination and delivery stages. Separate production timing from site arrival.
Plan receiving & support
Allocate unloading, handling, storage and installation. Agree spare parts, care instructions and the after-sales route.
Installation is a project interface.
Clarify assembled versus knock-down supply, glass handling, anchorage, perimeter waterproofing and responsibility for site work. Installation guidance and on-site installation are distinct scopes.
Match warranty terms to the order.
Review covered components, start date, location, exclusions and claims procedure. Clarify whether labor, travel, freight and replacement parts are included.
Review service & warranty informationBefore you specify or order
Your project questions, answered.
Do not decide from the model name alone. Match the proposed frame, glazing, dimensions and operating layout to the project location, performance requirements and applicable documents.
Start with WT-143 for two- or three-track layouts and WT-150 when comparing two-, three- or four-track options. Review frame depth, panel movement, sill details and project documentation before selecting.
Not necessarily. Fixed panels, overlap, stops, handles and screens affect usable passage. Record the rough opening, finished frame and clear passage separately on the opening schedule.
Review the selected system’s sill options with exterior levels, exposure and drainage. A flush appearance does not by itself establish accessibility compliance or the required water performance.
It identifies energy performance for the applicable whole-product configuration. Check the product and glazing against its label or directory record. It does not establish every structural, installation or local approval requirement.
Opening sizes and quantities, system and track choice, glass, hardware, finish, packing and the agreed supply boundary all affect the quote. Share the same requirements when comparing proposals.
Agree responsibility for installation, technical guidance, spare parts and warranty claims in the project quotation and terms. Confirm the service location and whether labor, travel and freight are included.
Send the project location, building type, opening schedule or sketches, quantities, performance requirements and target arrival date. Include glass, finish and hardware preferences where known; early discussions can begin with the information you already have.
Let’s discuss the next step
Bring your sliding door
project into focus.
Share your location, opening schedule, quantities and performance requirements. Discuss the system, documentation and supply scope for your U.S. or Canadian project.
LOCATION · OPENINGS · QUANTITY · REQUIREMENTS
